South Koreans Feel Cheated After U.S. Carrier Miscue
By CHOE SANG-HUN
News that the Carl Vinson strike group was thousands of miles from the Korean Peninsula rather than headed toward it drew accusations of bluffing and manipulation.
Philosopher and physician John Locke was born in Wrington, Somerset, England on this day in 1632.
"The end of law is not to abolish or restrain, but to preserve and enlarge freedom. For in all the states of created beings, capable of laws, where there is no law there is no freedom."
--John Locke from "Second Treatise of Government" (1689)
--John Locke from "Second Treatise of Government" (1689)
This volume includes the major works of the British Empiricists, philosophers who sought to derive all knowledge from experience.
By KATIE ZEZIMA
The Vermont Yankee nuclear reactor has many detractors across the state, but in Vernon the plant is seen as a vital part of the town.
OBAMA: You and W. liked Brennan well enough to put him in charge of the National Counterterrorism Center. And I didn’t want an attorney general who was a rubber stamp on torture.
CHENEY: The tea partiers agree with me about torture, and that’s why you’re already over, Mr. Charisma. First you lost Teddy Kennedy’s seat. Now you’ve lost his kid. Scott Brown will wipe the floor with you in Pennsylvania and Ohio.
Under Fire, Paterson Ends His Campaign for Governor
By DANNY HAKIM and JEREMY W. PETERS
Gov. David A. Paterson acknowledged an episode involving his longtime aide David W. Johnson had become a distraction, but he vowed to serve out the remainder of his term.
To Court Blacks, Foes of Abortion Make Racial Case
By SHAILA DEWAN
A movement long viewed as white and Republican is trying to expand by arguing that abortion is intended to wipe out blacks.
Working paper: The Supply Side of Innovation—H-1B Visa Reforms and U.S. Ethnic Invention
http://hbswk.hbs.edu/item/Most people in business must disagree with us detractors, because trillions of PowerPoint slides are produced every year. I have yet to find a rigorous examination at a fundamental level of why PowerPoint stinks and what might be better. Until now.大多數人在工作上都不會同意我們這種的攻訐者,因為每年有數以萬兆記的PPT投影片產出。現在,我卻必須從基本面出發,進行嚴格的檢視,看看PPT為何如此惡名昭彰,同時看看哪種方式會更好。
SPC: From Chaos To Wiping the Floor by Lynne Hare (Quality Progress. July 2003) www.asq.org/pub/qualityprogress/past/0703/58spc0703.html
或許可以翻譯為:SPC(統計流程管制):從渾沌到所向披靡
解釋一下副標題用語
mop up the floor with 或 wipe the floor with.
Defeat thoroughly, overwhelm, as in The young boxer said he was sure to mop up the floor with his opponent, or I just know we'll wipe the floor with the competition. [Late 1800s]
wipe the floor with sb INFORMAL
to defeat someone very easily:
"I hear Italy beat France in the semi-finals last night." "Beat them? They wiped the floor with them!"
proponent
n.
One who argues in support of something; an advocate.
[Latin prōpōnēns, prōpōnent-, present participle of prōpōnere, to set forth. See propose.]
detractor
noun [C]
someone who criticizes something or someone, often unfairly:
His detractors claim that his fierce temper makes him unsuitable for party leadership.
SPC: From Chaos To Wiping the Floor
by Lynne HareIn 50 Words Or Less
|
With the words of second guessers echoing, Shewhart struggled, as we all do, during the chaotic front end of scientific inquiry. If you recall how you stared at a blank sheet of paper or screen trying to develop an approach to your first, and every subsequent, term paper, you will remember the feeling Shewhart must have had as he dwelled on the nature of variation. Chaotic beginnings are always uncomfortable.
It was not popular in Shewhart's day to think of every data point as possessing both a deterministic and a random component even though statistical concepts had been around for many years. Still, with papal infallibility, the statement "All chance is but direction thou canst not see"1 loomed large. If we only had perfect knowledge, reasoned Shewhart, the random component would disappear. But who has time to wait for perfect knowledge? There is work to do. There are decisions to be made. We must have a method now.
Time To Apply Existing Theory
So, how much of a scientific observation is deterministic, and how much is random? Shewhart, a physicist and an empiricist who was up against problems of process control, devised a way to learn. The solution, he concluded in delightful understatement, "... requires the application of statistical methods which, up to the present time, have been for the most part left undisturbed in the journals in which they appeared."2
He began with the definition of control: "A phenomenon will be said to be controlled when, through the use of past experience, we can predict, at least within limits, how the phenomenon may be expected to vary in the future. Here it is understood that prediction within limits means we can state, at least approximately, the probability the observed phenomenon will fall within the given limits."3
From there, he went on to distinguish chance causes from assignable causes of variation--the deterministic element from the random element--believing the assignable causes of variation could be found and eliminated. The first published control chart issued as an internal Bell Telephone Laboratories report in May of 1924 was established to do just that.
The Economics of Change
Shewhart based control chart limits more on the economics of change than on underlying probabilities. Ever the empiricist, Shewhart seems not to have trusted probability limits alone. Instead, he drew his run charts, the basis of control charts, with limits based on marked improvements from previous periods of inspection (see "The First Control Chart"). He did bow in the direction of statistical theory, but theory alone did not form the limits.
His general reliance on practicality is exemplified by his famous experiments with a large serving bowl (see "Whatever Happened to That Bowl?" p. 61). Borrowed from Shewhart's own kitchen, it was used to hold numbered, metal lined, disk shaped tags, which he drew at random to confirm the standard deviation of subgroup sample means is the standard deviation of individual samples divided by the square root of the subgroup size.4 In symbols, Shewhart was seeking to satisfy himself of the relationship:
As his technology progressed, Shewhart introduced the extremely important concept of rational subgrouping. In the simplest of processes, a rational subgroup might consist of several items produced during a relatively short time period.
In more complicated processes, however, a rational subgroup should be representative of production and inclusive of potential structural variation. For example, dimensions of pieces from a six-lane stamping machine should be sampled in sets of six. (See "Structural Variation" for more clarification.) While this seems obvious, it is surprising how often this principle is ignored in practice. Shewhart recognized its importance and included it in his early work.
SPC's Transformation
Since those early days of the development of statistical process control (SPC) there have been contributors too numerous to list. The early developers included Harold Dodge, Harry Romig and W. Edwards Deming. Also included are Eugene Grant, author of the classic text Statistical Quality Control, first published in 1946,5 and the authors at Western Electric who first published the Statistical Quality Control Handbook in 1956.6
During this time, the formation of control chart limits transitioned from Shewhart's original concept of economic limits to probability limits usually based on group variation. Also, the term SPC began to stick and came to mean much more than the application of control charts alone. Topics such as acceptance sampling, data analysis and interpretation, and managing for quality were folded into the discipline.
The Rules
SPC is the application of statistical tools to the improvement of quality and productivity. Volumes of excellent advice concerning its use are available, including works by Deming7 and Joseph M. Juran.8
Preeminent among the SPC tools are control charts. Perhaps because of the inexactness of the science, control charts have been subject to differing opinions regarding their use, prompting a sea of debate. Their having served well despite these differing opinions is a tribute to the ruggedness of Shewhart's invention. Debated issues include the appropriateness of control charts, derivation of their limits, presence or absence of specification limits, sampling frequency, action rules and software.
Some experts think you should never expect the process mean to be stable, as Shewhart's control chart for the mean implies. Therefore, Shewhart methods suffer from a faulty assumption from the beginning. The argument is that process means will drift with any system of causes whether they are common or assignable, and in place of Shewhart control charts, one should use a predictive function based on time series methods, such as exponentially weighted moving averages (EWMA).9
The strategy is to use the model to predict the next process result. Then, if the observed and predicted values differ by more than chance alone would allow, there is sufficient information to persuade the user a process change has occurred. The user should take corrective action by adjusting the process or seeking the cause of the change or both. This line of reasoning has much merit, and EWMA and other time series methods serve well. So do Shewhart charts. They are different models for the same systems, and as George Box is fond of saying, "All models are wrong. Some are useful."10
Departing from Shewhart's initial notion, textbooks teach that control chart limits should be based on probability. Limits are usually plus or minus three standard errors from the mean where the standard error is the pooled standard deviation of the within time observations divided by the square root of the sample size.
You can imagine taking repeated sets of, say, five observations each from a manufacturing line over a shift's production. Combining these subgroup standard deviations into a single estimate, dividing that estimate by the square root of the sample size, multiplying the result by 3 and then adding and subtracting it from the target or central value produces these probability limits. Combining the standard deviations is accomplished by pooling using the equation:
The control limits would be the mean or target value ±3 times sp √n. This assumes the sample sizes are the same at each sampling time. Other, more sophisticated procedures can be found in this article's references.
It is disappointing to see some users place specification limits on control charts. Processes don't know or even care about specifications. The presence of specification limits on control charts encourages users to adjust on the basis of them instead of the calculated limits. The resulting miscued adjustments are likely to result in increased process variation, which is the opposite of the intent.
If treated well, processes will behave nearly consistently with capability, which is meant to be a measure of intrinsic, inherent variation. The use of specification limits is, most likely, an attempt to alert users when the process is creating units that are out of specification. Such efforts are misguided because most control charts work with sample means, not individual observations, and means have a narrower distribution than individual observations do.
Textbooks also teach that in order to establish control limits it is necessary to bring the process under control. This is as baffling as the huckster who promises to reveal techniques for making several million dollars, beginning his spiel by saying, "First, get one million dollars. Now ..."
By what means should you bring the process into control, and how, without a control chart, would you know if the process is in control? No process is ever in strict control if by that we mean it always performs as best it can. There is always some source of variation acting on any process.
A good start might be to collect subgroup samples in accordance with Shewhart's principle of rational subgroup sampling; quantify intrinsic, inherent process capability variation, structural variation and assignable cause variation; and then base the initial limits on the pooled within group variation, with allowance for some small structural variation. Procedures for doing this are explained in detail in "Statistics Roundtable: Chicken Soup for Processes" in the August 2001 issue of Quality Progress.11
Sampling frequency is always a bone of contention. Numerous papers have been written about establishment of sampling frequency on the basis of the costs of sampling, being out of control and adjustment. Many of the required input elements appear to be unknown and unknowable.
A parallel consideration is the use of run rules to augment control chart action rules, making them more powerful to detect departures from target. References consider corrective action necessary when two consecutive observations, for example, appear on the same side of the centerline between two and three standard errors from the centerline. Corrective action is also called for when seven consecutive observations appear on one side of the centerline.
There are many more such rules, and practitioners are confused about which rules to invoke. Average run length calculations can be helpful in these situations. Action rules trigger adjustment activity, and various adjustment rules such as "adjust by an amount that is equal to the difference between the last out of control observation and the target" find practical application. Such rules are ad hoc, and more work is needed to find adjustment rules that are both easy to use and effective. Practitioners would do well to recall the lessons learned from Deming's funnel experiment.12
SPC Doesn't Just Happen
SPC software is plentiful and relatively inexpensive, and organizational managers have fallen prey to the temptation to "install" SPC in manufacturing settings without understanding it themselves or providing training for users and their intermediate management. Auditors often find dust covered computer screens and process adjustments not justified by the charts. The disappointing results have caused some managers to believe SPC will not work in their processes.
Understandably, a strong desire to please customers encourages software vendors to compute every statistic known to humankind (and some not) to be able to claim their software will give their customers what's needed. The quality gurus, each of whom has favorite methods, encourage this. But with each added Cp, Cpk, skewness and kurtosis, the confusion mounts. What webs we weave!
Despite all the controversy, control charts and the rest of the tools used in SPC--check sheets, run charts, flow diagrams, histograms, Pareto charts and scatter diagrams, to name a few--have served remarkably well.
It's a Mindset
Some might ask why SPC didn't last. It did. People began to understand SPC is more than a set of statistical tools. It is a way of taming manufacturing processes, and its applications extend to all sorts of processes beyond manufacturing. It is a means of reducing process variation, working for the betterment of us all. It is fundamental to good process management, and the thinking is fundamental to good management, period.
We stray occasionally as we get lured into fad systems, but then we come back to basics. As Michael Hammer13 said in harsh metaphor:
From Wal-Mart and cross-docking to Toyota and just-in-time, these companies know winning does not depend on a clever plan or a hot concept. It depends on how regular, mundane, basic work is carried out. If you can consistently do your work faster, cheaper and better than the other guy, then you get to wipe the floor with him--without any accounting tricks. Relentless operational innovation is the only way to establish a lasting advantage. And new ideas are popping up all over.SPC grew into everything we do. It changed the way we think, work and act, and it evolved into total quality management (TQM). But there is an ebb and flow to new technologies in our society, and TQM's star faded in the presence of reengineering, which faded with the advent of Six Sigma. All the while, the basic SPC tools have been refined and augmented, and SPC serves in muted presence to underpin the newer, expanded technologies.
Operational innovation isn't glamorous. It doesn't make for amusing cocktail party conversation, and it's unlikely to turn up in the world of glam-business journalism. It's detailed and nerdy. This is old business, this is new business, this is real business. Get used to it.
REFERENCES
1. Walter A. Shewhart, Economic Control of Quality of Manufactured Product, Van Norstrand, 1931; republished by ASQ Quality Press, 1980.
2. Ibid.
3. Ibid.
4. E.R. Ott, comments in "Tributes to Walter A. Shewhart," Industrial Quality Control, August 1967.
5. E.L. Grant and R.S. Leavenworth, Statistical Quality Control, seventh edition, McGraw-Hill, 1996.
6. Statistical Quality Control Handbook, Western Electric, 1956.
7. W. Edwards Deming, Out of the Crisis, M.I.T. Center for Advanced Engineering Study, 1986.
8. J.M. Juran and A. Blanton Godfrey, Juran's Quality Handbook, fifth edition, McGraw-Hill, 1998.
9. George Box and Alberto Luceno, Statistical Control: By Monitoring and Feedback Adjustment, Wiley, 1997.
10. Robert Launer, Robustness in Statistics, Academic Press, 1979.
11. Lynne B. Hare, "Statistics Roundtable: Chicken Soup for Processes," Quality Progress, August 2001, p. 76.
12. Deming, Out of the Crisis, see reference 7.
13. Michael Hammer, "Forward to Basics," Fast Company, November 2002.
LYNNE B. HARE is associate director of technology guidance at Kraft Foods Research in East Hanover, NJ. He received a doctorate in statistics from Rutgers University, New Brunswick, NJ. Hare is a past chairman of ASQ's Statistics Division and an ASQ Fellow.
Cross-docking is a practice in logistics of unloading materials from an incoming semi-trailer truck or railroad car and loading these materials directly into outbound trucks, trailers, or rail cars, with little or no storage in between. This may be done to change type of conveyance, to sort material intended for different destinations, or to combine material from different origins into transport vehicles (or containers) with the same, or similar destination.
Cross-Dock operations were first pioneered in the US trucking industry in the 1930s, and have been in continuous use in LTL (less than truckload) operations ever since. The US Military began utilizing cross-dock operations in the 1950s. Wal-Mart began utilizing cross-docking in the retail sector in the late 1980s.
In the LTL trucking industry, cross-docking is done by moving cargo from one transport vehicle directly into another, with minimal or no warehousing. In retail practice, cross-docking operations may utilize staging areas where inbound materials are sorted, consolidated, and stored until the outbound shipment is complete and ready to ship.
Miscued | Define Miscued at Dictionary.com
www.dictionary.com/browse/miscued
a mistake. Informal. to make a mistake. Theater. to fail to answer one's cue or to answer another's cue. verb (used with object), miscued, miscuing.
miscue1
mɪsˈkjuː/
verb
past tense: miscued; past participle: miscued
- (in snooker and other sports) fail to strike (the ball or a shot) properly."he miscued a simple penalty in the sixth minute"
沒有留言:
張貼留言